Granny Smith TSF4

June 2022- July 2023

Gold Fields Limited
Laverton, WA
June 2022- July 2023

Goldfield’s Granny Smith Gold Operation is located southeast of Leinster in the Eastern Goldfields region of Western Australia. TSF 4 is a new facility located at the western end of the existing TSF facilities.

During the construction of TSF 3 IMC undertook the following activities

  • Cleaning of 132ha of vegetation
  • Stripping and haulage to stockpile of 240,000m3 of topsoil
  • 760,000m3 of new embankments, decant causeway and clay liner construction
  • Toe drain and underdrainage construction
  • While onsite IMC also undertook TSF 2 Buttress works which included 260,000m3 of buttress and access ramp construction and 8,100m of new HDPE pipelines

IMC self-performed the bulk earthworks, civil works and underdrainage installation of the project and managed the supply and installation of the HDPE pipework by a specialist subcontractor. The workforce on the TSF 4 project peaked at 70 personnel and there were zero LTI’s and no environmental incidents on the project.