Hazardous Facility Rehabilitation

August 2016 to November 2016

Rio Tinto
Dampier archipelago, south of Kangaroo Hill
August 2016 to November 2016

The company was contracted for the rehabilitation of a fibrous materials pit, including fibre removal, disposal, profiling, top soil and rehabilitation of the pit.

The equipment included D10 dozer, 30t excavators, 980 loaders, rigid haul trucks, 930 Integrated Tool carrier, 6×4 rigid watercarts and service equipment.