Roy Hill Rail Maintenance

October 2018 to ONGOING

Roy Hill
125 km of rail NW of Roy Hill Mine
October 2018 to ONGOING

The company was awarded a supplemental rail access road general works contract in support of the long relationship formed at the mine.

Our scope includes the maintenance of the wayside infrastructure including embankment, camp and demountable maintenance, ballast handling, drainage, culverts, access road, level crossings and general maintenance activities.

Whilst these works have ceased, the equipment utilised included 30t and 20t excavators, D9 dozers, 740 articulated dump trucks, 980 FELS, 16H and 140M graders, 6 and 8 wheel watercarts, rollers, bobcats, IT62H IT, water and service trucks.