Waste Dump Rehab

June 2020 - ONGOING

Rio Tinto
Paraburdoo Greater
June 2020 - ONGOING

The company was contracted for the rehabilitation of Eastern Range (ER) 37E Waste Dump and the entire Channar (CH) 64EN Waste Dumps, on the back of a long partnership with Rio Tinto.

Works involves clearing at the toe, re-profiling by dozing of slopes to their final landform design, hauling and spreading growth medium, construction of crest and toe bunds, contour ripping and seeding..

We are utilising equipment including D10 Dozers, D8 Dozers with specialised seeders, PC850 excavators, 972 Loaders, 140M graders, 40t articulated trucks, 40t water trucks and service vehicles.